It’s Fall, but are You Ready for Spring?

Chirping birds, budding blossoms, the last chill of winter chased by warm rays of sun.  All of these signal spring, and the start of boating season for the Upstate.  For many homeowners on the lake this may mean it’s time to start planning for a new dock.  This is also the time hopeful owners learn that dock-building and permitting is a months-long, detailed process.  For those ready to enjoy a new when the last frost melts, the time to start planning is now.  Kroeger’s dock production is scheduled months out from today.  That means docks purchased and permitted this fall will be built and installed this winter or spring.  Waiting could mean adding months more to the process, cutting into precious recreation time next year.  Give yourself a head start by giving us a call at (864) 882-7671 and let’s make sure you will be ready to go.  If you’re interested in the dock-building process, check out our timeline below:Our Design Process (2)

Advertisements

About Kroeger Marine Construction, Inc.

Kroeger Marine Construction has excelled for decades offering unmatched experience and quality in boat dock building, erosion control and boat lift installation. Our clients on Lake Keowee, Lake Hartwell, Lake Jocassee, Lake Thurmond and Lake Bowen know they are getting product quality and service that is second to none.
This entry was posted in Kroeger Marine Construction. Bookmark the permalink.

Leave a Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s